Landscape
Design for Olympic Forest Park and Central Zone, Beijing
Includes developing Forest Park
and the Central Zone into green ecological best. Meet
the special demands of the Olympic Games. Meet multifunctional
cultural demands in the long term by extending the concept
and following the general layout of the overall planning
of the Olympic Green.
Finalists selected for
design:
Schurmann Architechten (Germany),
Guangdong Architecture Design & Research Group (China)
Announcement on final design expected
within 1-2 months. Construction is expected to begin
by year-end.
Source of Funds: BOCOG
Method of Contracting: GC to be competitively bid
Applications to prequalify for
submission of landscape design schemes due to Beijing
Municipal Planning Commission no later than Aug. 5 before
12:00 noon (one original and two copies).
Notes:
Pre-qualification documents may be obtained until Aug.
1 from BOCOG Web site at www.beijing-olympic.org.cn.
Each applicant shall only participate
in prequalification for submitting the landscape design
schemes of this project singly or as a partner in a
joint venture. All correspondence and documents related
to the completition shall be written in Chinese and
English. In the event of a discrepancy, the Chinese
version shall prevail. To see an example of the prequalification
document that must be filled out and sent to the owner,
click
here
.
Owner:
Beijing Municipal Planning
Commission Mr. Wang Renfan
18th floor
60 Nanlishilu, Xicheng District, Beijing, China 100045
phone 86-10-68052299-2500
fax 86-10-68034099