New Frontiers
in Office Space
11/2006
By
Tristan Roberts

 |

Click
here to view a slide show; Photo
© Mike Sinclair |
|
KEY PARAMETERS
Jefferson City, Missouri, Missouri River watershed
GROSS SIZE FOOTAGE : 120,000ft2
/ 19,300 m2
COMPLETED: March 2005
COST: $18.1 million
ANNUAL ENERGY USE (based on bills):
68 kBtu/ft2 (775 MJ/m2)
ANNUAL CARBON FOOTPRINT (PREDICTED):20
lbs. CO2/ft2 (97 kg CO2/m2)
PROGRAM:Offices, conference
rooms, food service, atrium.
DATA click to View larger
 |
 |
 |
| Heating/Cooling |
Temp./Dew Point |
Sky Conditions |
Lewis & C lark TEAM
OWNER:State of Missouri,
Missouri Department of Natural Resources
ARCHITECT & INTERIOR DESIGN:
BNIM Architects
COMMISSIONING AGENT: Sys-Tek
ENGINEER Structural Engineering
(structural); Smith & Boucher (mechanical); FSC (electrical);
SK Design Group (civil)
LANDSCAPE: Conservation Design
Forum
ENVIRONMENTAL BUILDING DAYLIGHT DESIGN/ENERGY
STRATEGIES: ENSAR Group (now RMI/ENSAR Built Environment)
LIGHTING: Clanton Engineering
GENERAL CONTRACTOR: Professional
Contractors and Engineers
MECHANICAL SYSTEMS DESIGN: Rumsey
Engineers cost ESTIMATOR: Construction
Cost Systems
SOURCES
BYCYCLE RACKS: BRP Enterprises
WA2-11-SM unit masonry: Prairie Stone Northfield Block
STRUCTURALGLUED LAMINATED TIMBER:
Mississippi Laminators exterior architectural woodwork: Trex
(e ntry sun shade)
LINOLEUM: Armstrong Colorette
building insulation: Bonded Logic cotton fiber; International
Cellulose spray applied
SIDING: James Hardie Siding
Hardiplank lap siding interior doors: VT Industries Curries
quartersawn ash
ALUMINUM ENTRANCE AND WINDOWS: Kawneer
tubular skylights: Huvco
GLAZING: Low E Insulating Glass,
Viracon VE Ceramic-coated spandrel Insulating glass, Viracon
Heat Mirror lighting controls: Lutron
PV: Uni-Solar PVL Field Applied
Laminate louvers and vents: Greenheck
RAISED FLOOR: Haworth TecCrete
XL fabric lightshelves: Rosebrand polyester/lycra
|
Even before the outset of design and construction
of the Lewis and Clark State Office Building, the mission was clear:
create a green office building and certify it to the highest level
of LEED without overtaxing the credulity of the taxpayers in the
Show-Me States. The modest budget, $18.1 million, was
provided by the Missouri state legislature before the tenant, the
Department of Natural Resources, had even put the sustainability
goals on the table. But it was the writing on the wall that crystallized
the buildings environmental goals.
When we were interviewing for the project,
we spent one afternoon in the state Capitol building reading inscriptions
that are carved into a particular wall about the natural resources
of the state, says architect Steve McDowell, FAIA, of BNIM
Architects. We read about the minerals, animals, plants, riversall
the natural things that were important to the character and nature
of Missouri, he says. We thought we were already committed
to the green agenda, but looking back at what was important to the
founders and early citizens of the state influenced how deeply we
held those values through the project. That commitment was
nurtured from the beginning of the process, when BNIM organized
a design charrette that involved more than 100 people,
representing all parties involved in the project.
Not far from where Meriwether Lewis and William
Clark embarked on their exploration of the American West in 1804,
the building is a stones throw from the Missouri River. The
120,000-square-foot structure extends about 350 feet along the east-west
axis, and only 70 feet from north to south, a ratio that was calculated
to reduce energy costs and maximize interior daylight.
Choosing the site was integral to the project.
We started with some sites that we felt were unsuitable, because
they were set out in the suburbs, for example, so we challenged
our client to look for a more urban site, says Kimberly Hickson,
AIA, one of the project managers for BNIM. The state came back with
17 sites, including the one that was eventually chosen.
Constructed on the 144-acre site of the former
Jefferson City Correctional Facility, eight blocks from downtown,
the office building is one piece of an ambitious mixed-use urban
redevelopment project. It took the place of a former womens
prison, with bricks from the prison being used for a number of interior
surfaces.
In a landscape design based on xeriscape principles,
indigenous grasses, shrubs, and trees have thrived despite a dry
first year. Vegetated bioswales and topography that encourages stormwater
infiltration help meet a goal of keeping runoff out of the municipal
stormwater system. The landscaping is not without maintenance needs,
but they are considerably less than in a conventional landscape.
We pull weeds from it. It has been mowed once, says
Dan Walker, director of the general services program for the Department
of Natural Resources, who represented the tenant throughout design
and construction. Nature trails around the site and reaching toward
the river are planned.
Green features extend from the outside into
the building. A 50,000-gallon cistern collects rainwater from the
roof, which is filtered and used in flushing toilets. The system
conserved 405,000 gallons in its first 13 months. One hundred and
sixty-eight photovoltaic panels produce 21.5 kilowatts of power,
or 2.5 percent of the buildings needs. Thanks in large part
to a well-planned daylighting system and the careful design of the
heating and cooling system, the building is predicted to use less
than half of the energy of a comparable ASHRAE base model.
The narrow aspect ratio of the building, solar
orientation, and both interior and exterior light shelves help daylight
penetrate deep into the office space. Employees enjoy access to
views and daylight at workstations that are located around the perimeter.
Enclosed rooms are generally situated at the core. Many of the windows
are operable, providing natural ventilation. Although the daylighting
scheme went through computer modeling by ENSAR Group, which has
since merged with the Rocky Mountain Institutes Green Development
Services, during part of the winter a gap between the interior canvas
light shelves and the glazing causes glare in some workstations.
A miscommunication with the fabricator led to the mistake, which
wasnt present in models, and the problem is being fixed in
time for next winter.
The building design also keeps employees active.
Amenities such as changing rooms and showers were created largely
for those who bike to work, but also encourage occupants to exercise.
A number of people jog during their lunch breaks, according to Walker,
and some walk downtown for meetings. Nearly everyone uses the prominent
and attractive stairs in the central atrium.
Although all of these features reduce operating
costs and increase occupant satisfaction, the building team was
still concerned that its construction budget would lead to compromises.
At one point, the state balked at buying the low-emissivity glass
specified by the architect, so the firm ran an energy model with
a lower-cost alternative. We found that we could spend the
money on glass or we could spend it on a bigger mechanical system,
Hickson says, noting that the mechanical system would add energy
and maintenance costs over the long run. The glass stayed. The engineer
performed a similar analysis on the buildings aspect ratio
when the client wanted a boxier profile; again, the analysis confirmed
the efficiency of the design.
The project used an integrated design process,
but owing to the requirements of competitive bidding, a contractor
wasnt involved early on. I guess we were all somewhat
nervous at the bid opening, says Hickson. We didnt
really know where it would fall. The team received a low bid
from a trusted contractor, although one without experience in green
building. The contractor worked hard to meet the sustainability
goals and helped the team gain LEED points in construction waste
recycling and recycled content of materials, at a time when the
project was on the edge of achieving Platinum. There was a
lesson there, says Laura Lesniewski, AIA, BNIMs project
manager during the construction phase. If you have someone
whos interested in learning, he doesnt need to have
prior experience.
Despite the projects impressive achievement
in the LEED rating system, the team gave up points along the way.
It procured lumber from Missouris only certified sustainable
forest for the atrium, but for the roof structure, which uses exposed
glued laminated beams, the team couldnt locate a product with
certified content. It also hoped to earn a point for reducing the
urban heat island effect with reflective roofing, but the emissivity
level of the roof left them a fraction short of the requirement.
The team went to extra lengths to achieve
some points, such as using furniture that meets indoor air quality
(IAQ) standards. State agencies are required to purchase furniture
manufactured through prison inmate vocational programs, so the team
brought its sustainability agenda to the prisons, working to help
them achieve Greenguard Indoor Air Quality listing for its furniture.
The building performs well and our occupants
are extremely happy from the perspective of IAQ, lighting, and heating
and cooling, says Walker. Several occupants have reported
better health in this building after having sinus problems in previous
buildings, he adds. Walker has also noted reduced absenteeism, an
observation the department plans to investigate by examining employment
records.
By all accounts, the success of the project
was based on the commitment to sustainability by the key members
of the team. Built on budget, the building is also meeting financial
performance expectations over the long term. We did life-cycle
costing on every aspect of the building, and so far things are on
schedule, says Walker.
|