subscriptions
e-newsletters
contact us
about us
advertise
Project Bids & Legal Notices

Invitation to Bid to the
Metropolitan Water
Reclamation District of
Greater Chicago for
Connecting Tunnels and Gates, Thornton Composite Reservoir,
Contract 04-202-4F

Construction includes 1,300 linear feet of 30-foot inside diameter concrete lined tunnel, a tunnel portal structure, a diffuser apron, a concrete lined gate shaft with excavated diameter of 63 feet and depth of 341 feet, a control building, steel lined tunnel bifurcations, four wheel gates, a maintenance bulkhead, two Jet Flow dewatering gates, a live connection to the existing tunnel, and ancillary work. The estimated cost of the work is $202,000,000.00.  The mandatory pre-bid site walk-through will commence on Tuesday, June 23, 2009 at 9:00 a.m. Central time.  The mandatory pre-bid conference will commence on Tuesday June 23, 2009 at 1:30 p.m. Central time. 

For further information, visit
http://mwrd.org or call the
Procurement and Materials Management Department at (312) 751-6643.

Recent Job Postings:
----- Advertising -----
Construction Outlook Report
McGraw-Hill Construction Outlook 2010 Report

NEW McGraw-Hill Construction Outlook 2010 Report
The industry's highly respected and most closely watched outlook for the year ahead brings you a first-hand view of industry trends and the economic forecast that will affect the construction industry in 2010.

Order Now

View more analytics reports and products >>
GreenReports
Global Green Building Trends

Global Green Building Trends SmartMarket Report
The first ever global scale green building study, this report details the market trends and activities driving green building growth worldwide.

Purchase for only $149.00

View all Green Reports >>
----- Advertising -----