Project Type
Trade
Steel & Precast Conc. Erectors (DBE,WBE), Contrs. Equip.--Flashers/Barricades/Etc. (DBE,WBE), Coatings & Linings--Pipe & Tank, Columns, Industrial Air Compressors--Stationary, Concrete Additives & Curing Compounds, Concrete Breaking, Sawing & Drilling, Bollards, Concrete Contrs.--Reinforced Concrete, Concrete Repair & Restoration Contrs.
Report Type
Project
Project Delivery System
From Service
Status
Bids to Owner Public - State December 17 at (CDT)
Publish Date
10/06/2026
Target Bid Date
Target Start Date
Last Updated Date
08/05/2026
Source of Funding
Owner Type
State
Type of Work
Bridge
Special Conditions
Item Category
-